[Nameplate] Fog/Mist ~ 60°F  
High: 80°F ~ Low: 62°F
Friday, Apr. 29, 2016

Viola High School construction

Thursday, July 9, 2009

(Photo)
Workers prepare to pour concrete at the Viola High School worksite. This area will be an interior hallway and has been designed as a storm shelter, with reinforced concrete to be placed on the sides and eventually over the top of it. Photo by Niki de Soto



Respond to this story

Posting a comment requires free registration: