[Nameplate] Fair ~ 92°F  
High: 96°F ~ Low: 74°F
Wednesday, Aug. 20, 2014

Viola High School construction

Thursday, July 9, 2009

(Photo)
Workers prepare to pour concrete at the Viola High School worksite. This area will be an interior hallway and has been designed as a storm shelter, with reinforced concrete to be placed on the sides and eventually over the top of it. Photo by Niki de Soto



Respond to this story

Posting a comment requires free registration. If you already have an account on this site, enter your username and password below. Otherwise, click here to register.

Username:

Password:  (Forgot your password?)

Your comments:
Please be respectful of others and try to stay on topic.